← Back to the list

Register / Grid infrastructure / EIR-1353
Grid infrastructureSouth AfricaEIR-1353

Fires at City Power substations in Johannesburg estimated to cost R106 million to restore

2023Published 28 Sept 2026

Companies named in this entry: City Power

Over about 18 months to June 2023, at least seven fires were reported at City Power substations in Johannesburg. The latest named was the Brixton traction substation, less than a week after a fire at a City Power substation in Soweto. The fires caused significant inconvenience for residents and compounded load shedding. Not all of the affected substations were fully operational afterwards. City Power estimated that restoring them to full capacity would cost R106 million, and reported an asset renewal backlog of R3.6 billion on substations and transmission lines.

City Power said the fires were linked to a range of issues, including theft and vandalism, rolling blackouts and overloading of transformers. An energy expert quoted in the report also pointed to ageing equipment, poor maintenance and missing protective devices, but those points were not confirmed as the cause of these fires.

  1. Treat theft, vandalism, rolling blackouts and transformer overload as concurrent risks at urban substations.
  2. Fund predictive and preventative maintenance, and replacement of ageing transformers, so renewal does not sit as a large backlog.
  3. Keep contingency plans required by the regulator in place for every substation and usable after a fire.

Published 2026-09-28. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Grid infrastructure incidents in South Africa: 56 entries, with a free alert for the next one.

Browse the full register or submit an incident.