Rotor and blades fall from turbine at Rugby wind farm, North Dakota
Mar 2011Published 16 Sept 2026Responsible editor: Chief Editor
- Where
- Rugby wind farm, near Rugby, North Dakota
- Operator
- Iberdrola Renewables Inc.
- What
- rotor and three blades detached from one turbine and fell
- Injuries
- None reported
- Cause
- rotor assembly failure
Get the next one by email
Free alerts on wind (onshore) incidents in the United States, and an email when EIR-0918 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Iberdrola Renewables, Suzlon Wind Energy
What happened
On 14 March 2011, the rotor and three large blades detached from one turbine tower at the Rugby wind farm, near Rugby, North Dakota, and fell to the ground. The site, operated by Iberdrola Renewables Inc., has 71 turbines and a capacity of up to 149 megawatts. No one was injured. Iberdrola described the failure as a rotor assembly failure in a letter to North Dakota's Public Service Commission. The wind farm was inspected following the incident and judged safe, resuming operation about a week later, on 21 March 2011.
An investigation into the cause had not been completed at the time the farm resumed generating. The turbine manufacturer, Suzlon Wind Energy Corp., called the event an isolated incident and stated confidence in the safe operation of its global turbine fleet.
Contributing factors
Iberdrola stated the cause was a rotor assembly failure, though the full investigation had not concluded by the time reporting occurred.
Lessons learned
- Rotor assembly failure on a wind turbine can cause the full rotor and blades to detach without warning, so operators should add detailed checks of hub and bearing bolts to routine inspections.
- After a rotor assembly failure at one turbine, the operator must inspect all turbines of the same design before resuming output.
- A nacelle or hub fault that drops blades requires early detection systems and exclusion zones, as ground crews cannot prevent the fall.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- Full results of the cause investigation
- Turbine model and age
- Cost of repairs and lost revenue
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Site page: Rugby Wind Power Project (status, dates and other incidents)
Published 2026-09-16. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.