Wind (onshore)United StatesEIR-0918

Rotor and blades fall from turbine at Rugby wind farm, North Dakota

Mar 2011Published 16 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
turbine out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Rugby wind farm, near Rugby, North Dakota
Operator
Iberdrola Renewables Inc.
What
rotor and three blades detached from one turbine and fell
Injuries
None reported
Cause
rotor assembly failure

Companies named in the reporting of this entry (being named is not a finding of fault): Iberdrola Renewables, Suzlon Wind Energy

On 14 March 2011, the rotor and three large blades detached from one turbine tower at the Rugby wind farm, near Rugby, North Dakota, and fell to the ground. The site, operated by Iberdrola Renewables Inc., has 71 turbines and a capacity of up to 149 megawatts. No one was injured. Iberdrola described the failure as a rotor assembly failure in a letter to North Dakota's Public Service Commission. The wind farm was inspected following the incident and judged safe, resuming operation about a week later, on 21 March 2011.

An investigation into the cause had not been completed at the time the farm resumed generating. The turbine manufacturer, Suzlon Wind Energy Corp., called the event an isolated incident and stated confidence in the safe operation of its global turbine fleet.

Iberdrola stated the cause was a rotor assembly failure, though the full investigation had not concluded by the time reporting occurred.

  1. Rotor assembly failure on a wind turbine can cause the full rotor and blades to detach without warning, so operators should add detailed checks of hub and bearing bolts to routine inspections.
  2. After a rotor assembly failure at one turbine, the operator must inspect all turbines of the same design before resuming output.
  3. A nacelle or hub fault that drops blades requires early detection systems and exclusion zones, as ground crews cannot prevent the fall.

More lessons on structural integrity and turbines, from every incident on the register.

  • Full results of the cause investigation
  • Turbine model and age
  • Cost of repairs and lost revenue

This entry is updated when these are reported. Get an alert for the next one like it.

Site page: Rugby Wind Power Project (status, dates and other incidents)

Published 2026-09-16. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Wind (onshore) incidents in the United States, by year, free with a credit (PNG).

Wind (onshore) incidents in the United States: 104 entries, with a free alert for the next one.

Wind turbine fires: the counts, the latest entries and a free alert for the next one. Also: wind turbine blade failures.

Browse the full register or submit an incident.