Clamp failure and coolant leak found during Moss Landing battery restart testing
EIR-0877PG&E began returning its Elkhorn Battery Energy Storage System at Moss Landing, California to service on 1 June 2025, following an automatic shutdown on 16 January 2025 when the system's infrared fire detection picked up flames from a fire at the neighbouring Vistra Energy battery facility. During testing, PG&E identified a clamp failure and a subsequent coolant leak in one of the 256 Tesla Megapacks on site. PG&E said there were no injuries, power outages, smoke or fire associated with the clamp failure and coolant leak. Tesla, which maintains the Elkhorn system for PG&E, has evaluated the failed clamp and is developing an inspection and repair plan. PG&E's best estimate for a return to service is now 30 June 2026. The system will remain electrically disconnected from the grid in a safe, idle state, apart from connecting to maintain at or near minimum state of charge, until repairs are completed.
A clamp failure in one Megapack led to a coolant leak during the planned, staged restart and testing process that PG&E began after the extended shutdown caused by the neighbouring facility fire. The underlying cause of the clamp failure is not reported.
- Phased, conservative restart testing after an extended shutdown can surface latent mechanical issues before they escalate into more serious failures.
- A single component failure affecting a coolant or thermal management circuit warrants inspection across the wider fleet of identical units before full reactivation.
- Operators should keep local stakeholders informed when safety-driven repairs extend return to service timelines.