Battery storage · United States
Elkhorn Battery Energy Storage System
Operator Pacific Gas & Electric Co.
Operational183 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Elkhorn Battery Energy Storage System is a 183 MW battery storage site 5.2 km north-west of Castroville, Monterey County, California, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 4 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds 8 incidents at this site, the latest in 2026.
Incidents on the register at this site
8 incidents at Elkhorn Battery Energy Storage System, from 2021 to 2026, 1 classed as major. Oldest first.
On 4 September 2021, the Moss Landing Energy Storage Facility in California, operated by Vistra Energy, experienced an overheating issue affecting a limited number of battery modules in its Phase I 300 MW/1200 MWh system. Local fire crews responded to a...
In September 2022, a fire occurred in a single Tesla Megapack battery enclosure at the Elkhorn Battery Energy Storage System in Moss Landing, California, United States, owned and operated by Pacific Gas and Electric (PG&E). The site held 256 Megapack units....
On 13 February 2022, an early detection safety system activated at the 100 MW Phase II building of the Moss Landing Energy Storage Facility in Moss Landing, California, operated by Vistra Energy. An investigation found that the water-based suppression system...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
PG&E began returning its Elkhorn Battery Energy Storage System at Moss Landing, California to service on 1 June 2025, following an automatic shutdown on 16 January 2025 when the system's infrared fire detection picked up flames from a fire at the neighbouring...
In January 2025, a fire broke out during the afternoon in one building of the Moss Landing Energy Storage Facility (Phase 1, MOSS300) in Moss Landing, Monterey County, California, United States, a large grid-scale lithium-ion battery energy storage facility...
On 16 January 2025, Pacific Gas and Electric (PG&E) shut down its Elkhorn battery storage facility in Monterey County, California, after its safety protocol equipment detected a fire at an adjacent battery facility owned by Vistra Corp. The PG&E facility did...
A fire was reported at the Vistra battery energy storage system facility in Moss Landing, California, on the Tuesday night before the report was published on 20 February 2025. Smoke was seen coming from the previously burned section of the Moss 300 building,...
A fire broke out at Vistra's 300-megawatt battery energy storage facility in Moss Landing, California, during ongoing cleanup and demolition work following a major fire at the site in January 2025. By noon on the day of the incident, officials said there was...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Elkhorn Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (730 MWh)
- Capacity
- 183 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- Pacific Gas & Electric Co.
- Owner
- Pacific Gas & Electric Co.
- Location
- Monterey County, California, United States
- First operating
- 2022
- Balancing authority
- CISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Elkhorn Battery Energy Storage System had a fire or other incident?
- Yes. The register holds 8 incidents that name it: Battery overheating forces shutdown of Moss Landing Phase I storage facility (EIR-0632, 2021); Megapack fire at PG&E Elkhorn Battery, Moss Landing, California (EIR-0009, 2022); Water based suppression system leak causes battery shorting at Moss Landing Phase II (EIR-0630, 2022); and more on this page.
- What is the status of Elkhorn Battery Energy Storage System?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Elkhorn Battery Energy Storage System?
- 5.2 km north-west of Castroville, Monterey County, California, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).