Fire at Hala Naka Road grid station in Hyderabad causes six hour outage
June 2026Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Hala Naka Road 220kV grid station in Hyderabad, Pakistan
- Operator
- National Grid
- What
- Fire in one of three large power transformers
- Injuries
- None reported
- Response
- Fire crews and National Grid staff controlled blaze in five hours
Get the next one by email
Free alerts on grid infrastructure incidents in Pakistan, and an email when EIR-0251 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): National Grid
What happened
A fire broke out in one of three large power transformers at the Hala Naka Road 220kV grid station in Hyderabad, Pakistan in the early morning, disrupting electricity supply to the city and nine surrounding towns for approximately six hours. Eight urban feeders and ten outlying 132kV grid stations lost supply. A high voltage direct current transmission link connected to the affected system was also impacted, with knock-on effects on supply to a major nearby city.
Fire crews and National Grid staff worked together to bring the blaze under control within about five hours. The damaged transformer was isolated and the network was re-energised through the two remaining transformers of the same capacity, restoring supply. National Grid ordered an investigation into the cause and stated the damaged unit would be repaired or replaced. No injuries were reported in the available account.
Contributing factors
Not reported. National Grid stated an investigation into the cause of the fire had been ordered but no findings were available at the time of reporting.
Lessons learned
- Redundant transformer capacity at a 220kV grid station allows supply to be restored quickly by isolating the damaged unit and routing load through unaffected units of the same capacity.
- Transformer fires at grid stations require close coordination between fire crews and National Grid staff to contain the blaze and limit outage duration to six hours.
- A single transformer fire at a 220kV grid station can affect an HVDC transmission link and cause knock-on supply loss to a major nearby city.
More lessons on electrical protection and isolation, fire suppression and firefighting, outages, backup supply and restoration, from every incident on the register.
Not yet known
- Cause of the fire
- Transformer model and age
- Cost of repair or replacement
This entry is updated when these are reported. Get an alert for the next one like it.