Planning pack for this site, £295Other options

Solar · United Kingdom

Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array

Operator Downing Energy Development Company Limited · Owner Bagnall Energy Limited

Revised0.4 MWData checked 16 November 2026Source record dated 13 June 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array is a 0.4 MW solar farm 5.8 km south of York, North Yorkshire, United Kingdom. Its planning application (23/01038/CPD) went to York on 25 May 2023 and was refused on 20 July 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 43 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

DOWNING ENERGY DEVELOPMENT COMPANY LIMITED (13044362), active, since 2020. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton32 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof45 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster48 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Downing Energy Development Company Limited
Owner
Bagnall Energy Limited
Location
Yorkshire Water Naburn, Waste Water Treatment Works, Naburn Lane, York, North Yorkshire, YO19 4RN, United Kingdom
Planning authority
York
Planning application
23/01038/CPD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01038/CPD, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

  • 25 May 2023 Planning application submitted
  • 20 July 2023 Planning permission refused

None found. The register holds no published incident that names Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2023.
Where is Yorkshire Water Naburn, Naburn Lane - Ground Mounted Solar Array?
5.8 km south of York, North Yorkshire, United Kingdom (postcode YO19 4RN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).