Heanor Road - Battery Energy Storage System

Operator Downing Energy Development Company Limited · Owner Heanor Energy Storage Park Limited

Awaiting Construction40 MWData checked 16 November 2026Source record dated 17 March 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Heanor Road - Battery Energy Storage System is a 40 MW battery storage site in Heanor, Derbyshire, United Kingdom. Its planning application (AVA/2024/0059) went to Amber Valley on 28 February 2024 and was granted on 14 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 51 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

DOWNING ENERGY DEVELOPMENT COMPANY LIMITED (13044362), active, since 2020. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Heanor Road - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells20 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool112 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire150 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Downing Energy Development Company Limited
Owner
Heanor Energy Storage Park Limited
Location
Ne/O Heanor Road,Heanor, Derbyshire, DE75 7AA, United Kingdom
Planning authority
Amber Valley
Planning application
AVA/2024/0059

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for AVA/2024/0059, with what the planning evidence pack adds for this site.

Every application in Amber Valley · Alerts for applications and incidents near here

  • 28 February 2024 Planning application submitted
  • 14 February 2025 Planning permission granted

None found. The register holds no published incident that names Heanor Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Heanor Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Heanor Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Heanor Road - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2025.
Where is Heanor Road - Battery Energy Storage System?
In Heanor, Derbyshire, United Kingdom (postcode DE75 7AA).