Planning pack for this site, £295Other options

Solar · United Kingdom

Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels

Operator Toray Advanced Composites

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 16 February 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels is a 0.5 MW solar farm in Heanor, Nottinghamshire, United Kingdom. Its planning application (PDR/2022/0046) went to Amber Valley on 13 October 2022 and was granted on 22 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 47 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby34 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge46 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Toray Advanced Composites
Location
Factory Tencate Advanced Composites Limited, Amber Drive, Langley Mill, Nottingham, Nottinghamshire, NG16 4BE, United Kingdom
Planning authority
Amber Valley
Planning application
PDR/2022/0046

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PDR/2022/0046, with what the planning evidence pack adds for this site.

Every application in Amber Valley · Alerts for applications and incidents near here

  • 13 October 2022 Planning application submitted
  • 22 December 2022 Planning permission granted
  • 22 December 2025 Planning permission expired

None found. The register holds no published incident that names Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2023.
Where is Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels?
In Heanor, Nottinghamshire, United Kingdom (postcode NG16 4BE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).