Planning pack for this site, £295Other options

Solar · United Kingdom

Biology Department, Wentworth Way - Solar Panels

Operator University of York

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 19 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Biology Department, Wentworth Way - Solar Panels is a 0.2 MW solar farm on the edge of York, North Yorkshire, United Kingdom. Its planning application (25/01165/SOLAR) went to York on 11 June 2025 and was granted on 1 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 45 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

UNIVERSITY OF YORK (RC000679), active. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Biology Department, Wentworth Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton27 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof49 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
University of York
Location
Biology Department, Wentworth Way, Heslington, York, North Yorkshire, YO10 5DD, United Kingdom
Planning authority
York
Planning application
25/01165/SOLAR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01165/SOLAR, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

  • 11 June 2025 Planning application submitted
  • 1 August 2025 Planning permission granted
  • 1 August 2028 Planning permission runs out

None found. The register holds no published incident that names Biology Department, Wentworth Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Biology Department, Wentworth Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Biology Department, Wentworth Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Biology Department, Wentworth Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2025.
Where is Biology Department, Wentworth Way - Solar Panels?
On the edge of York, North Yorkshire, United Kingdom (postcode YO10 5DD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).