Solar · United Kingdom

Yerbeston Gate Farm

Operator Sunsave 23 Limited& Vogt solar

Operational6.1 MWData checked 16 November 2026Source record dated 5 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yerbeston Gate Farm is a 6.1 MW solar farm 11 km north-east of Pembroke, Dyfed, United Kingdom. Its planning application (13/0501/PA) went to Pembrokeshire on 2 September 2013 and was granted on 2 December 2013. It has been operating since 25 November 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

119 energy sites within 40 km for Yerbeston Gate Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Sunsave 23 Limited& Vogt solar
Location
Land north, west and south of Yerbeston Gate, Yerbeston, Kilgetty, SA68 0NS, Dyfed, SA68 0NS, United Kingdom
Planning authority
Pembrokeshire
Planning application
13/0501/PA
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/0501/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 2 September 2013 Planning application submitted
  • 2 December 2013 Planning permission granted
  • 25 September 2015 Construction started
  • 25 November 2015 Operational

None found. The register holds no published incident that names Yerbeston Gate Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Yerbeston Gate Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yerbeston Gate Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Yerbeston Gate Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 February 2016.
Where is Yerbeston Gate Farm?
11 km north-east of Pembroke, Dyfed, United Kingdom (postcode SA68 0NS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).