Solar · United Kingdom
Bluestone National Park Resort, Canaston Wood - Solar Farm
Operator Bluestone Resorts Limited
Application Submitted4 MWData checked 16 November 2026Source record dated 5 January 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bluestone National Park Resort, Canaston Wood - Solar Farm is a 4 MW solar farm 12 km east of Haverfordwest, Dyfed, United Kingdom. Its planning application (22/0804/PA) went to Pembrokeshire on 14 December 2022. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 6 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bluestone National Park Resort, Canaston Wood - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bluestone National Park Resort, Canaston Wood - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 137 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 137 km | Significant |
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 140 km | Minor |
| EIR-1541 | 2015 | Transformer unit fire at a solar farm on Copshorn Road, Bodmin | 146 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Bluestone Resorts Limited
- Location
- Bluestone National Park Resort, Canaston Wood, Narberth, Dyfed, SA67 8DE, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 22/0804/PA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/0804/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 14 December 2022 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Bluestone National Park Resort, Canaston Wood - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bluestone National Park Resort, Canaston Wood - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bluestone National Park Resort, Canaston Wood - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bluestone National Park Resort, Canaston Wood - Solar Farm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2023.
- Where is Bluestone National Park Resort, Canaston Wood - Solar Farm?
- 12 km east of Haverfordwest, Dyfed, United Kingdom (postcode SA67 8DE).