Onshore wind · United Kingdom
Newhouse Farm, Canaston Bridge - Wind Turbines
Operator Slebech Investment Limited
Application Withdrawn3 MWData checked 16 November 2026Source record dated 7 November 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Newhouse Farm, Canaston Bridge - Wind Turbines is a 3 MW wind farm 12 km east of Haverfordwest, Dyfed, United Kingdom. Its planning application (25/0196/PA) went to Pembrokeshire on 3 June 2025 and was withdrawn on 30 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 6 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Newhouse Farm, Canaston Bridge - Wind Turbines changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Slebech Investment Limited
- Location
- Newhouse Farm And Blackpool Farm, Canaston Bridge, Narberth, Dyfed, SA67 8DE, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 25/0196/PA
- Turbines
- 3, 100 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 25/0196/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 3 June 2025 Planning application submitted
- 30 June 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Newhouse Farm, Canaston Bridge - Wind Turbines. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Newhouse Farm, Canaston Bridge - Wind Turbines had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Newhouse Farm, Canaston Bridge - Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Newhouse Farm, Canaston Bridge - Wind Turbines?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 7 November 2025.
- Where is Newhouse Farm, Canaston Bridge - Wind Turbines?
- 12 km east of Haverfordwest, Dyfed, United Kingdom (postcode SA67 8DE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).