Onshore wind · United Kingdom
Summerton Farm, Sageston - Wind Turbine
Operator Constantine Wind Energy Limited
Application Refused0.3 MWData checked 16 November 2026Source record dated 8 July 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Summerton Farm, Sageston - Wind Turbine is a 0.3 MW wind farm 8.3 km east of Pembroke, Dyfed, United Kingdom. Its planning application (23/0723/PA) went to Pembrokeshire on 30 November 2023 and was refused on 11 March 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 17 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Summerton Farm, Sageston - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
CONSTANTINE WIND ENERGY LIMITED (07663015), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Constantine Wind Energy Limited
- Location
- North of Summerton Farm Sageston, Dyfed, SA70 8NS, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 23/0723/PA
- Turbines
- 1, 90 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/0723/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 30 November 2023 Planning application submitted
- 11 March 2024 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Summerton Farm, Sageston - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Summerton Farm, Sageston - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Summerton Farm, Sageston - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Summerton Farm, Sageston - Wind Turbine?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
- Where is Summerton Farm, Sageston - Wind Turbine?
- 8.3 km east of Pembroke, Dyfed, United Kingdom (postcode SA70 8NS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).