Solar · United Kingdom

Land West of Roberts Wall Far

Operator Navitas Project

Operational2.5 MWData checked 16 November 2026Source record dated 24 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land West of Roberts Wall Far is a 2.5 MW solar farm 11 km east of Pembroke, United Kingdom. Its planning application (14/1055/PA) went to Pembrokeshire on 17 February 2015 and was granted on 26 June 2015. It has been operating since 23 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 116 energy sites within 40 km for Land West of Roberts Wall Far

Members see the sites and incidents around this one, and every record behind them.

NAVITAS PROJECT SOLUTIONS LIMITED (05530513), active, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Navitas Project
Location
Land West of, Roberts Wall Far, Trefloyne Lane, Penally, Tenby, Dyfed, Pembrokeshire, SA70 8NF, United Kingdom
Planning authority
Pembrokeshire
Planning application
14/1055/PA
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/1055/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 17 February 2015 Planning application submitted
  • 26 June 2015 Planning permission granted
  • 1 February 2016 Construction started
  • 23 March 2016 Operational

None found. The register holds no published incident that names Land West of Roberts Wall Far. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land West of Roberts Wall Far had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land West of Roberts Wall Far; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land West of Roberts Wall Far?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2016.
Where is Land West of Roberts Wall Far?
11 km east of Pembroke, United Kingdom (postcode SA70 8NF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).