← Back to Shropshire

Solar · United Kingdom

Land To The North Of Moor Farm

Operator Navitas Project

Operational3.8 MWData checked 16 November 2026Source record dated 4 September 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land To The North Of Moor Farm is a 3.8 MW solar farm 12 km south-west of Wem, Shropshire, United Kingdom. Its planning application (15/01805/FUL) went to Shropshire on 14 May 2015 and was granted on 6 January 2016. It has been operating since 11 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 203 energy sites within 40 km for Land To The North Of Moor Farm

Members see the sites and incidents around this one, and every record behind them.

NAVITAS PROJECT SOLUTIONS LIMITED (05530513), active, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Navitas Project
Location
Land To The North Of Moor Farm, Ruyton Road, Baschurch, Shrewsbury, Shropshire, SY4 2, United Kingdom
Planning authority
Shropshire
Planning application
15/01805/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01805/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 14 May 2015 Planning application submitted
  • 6 January 2016 Planning permission granted
  • 1 June 2016 Construction started
  • 11 March 2017 Operational

None found. The register holds no published incident that names Land To The North Of Moor Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land To The North Of Moor Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land To The North Of Moor Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land To The North Of Moor Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2017.
Where is Land To The North Of Moor Farm?
12 km south-west of Wem, Shropshire, United Kingdom (postcode SY4 2).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).