Wykey Farm, Ruyton Xi Towns - Solar Array
Operator W H Gittins & Sons
Awaiting Construction1 MWData checked 16 November 2026Source record dated 29 March 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wykey Farm, Ruyton Xi Towns - Solar Array is a 1 MW solar farm 11 km south-east of Oswestry, Shropshire, United Kingdom. Its planning application (22/01123/FUL) went to Shropshire on 8 March 2022 and was granted on 13 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 16 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Wykey Farm, Ruyton Xi Towns - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wykey Farm, Ruyton Xi Towns - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1547, Small fire within a solar panel at a house in Shropshire, 26 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1547 | 2025 | Small fire within a solar panel at a house in Shropshire | 26 km | Minor |
| EIR-1550 | 2021 | Small fire involving solar panels at a property in Clun | 26 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 29 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- W H Gittins & Sons
- Location
- Wykey Farm Wykey Ruyton Xi Towns Shrewsbury, Shropshire, SY4 1JA, United Kingdom
- Planning authority
- Shropshire
- Planning application
- 22/01123/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01123/FUL, with what the planning evidence pack adds for this site.
Every application in Shropshire · Alerts for applications and incidents near here
Timeline
- 8 March 2022 Planning application submitted
- 13 May 2022 Planning permission granted
- 13 May 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Wykey Farm, Ruyton Xi Towns - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wykey Farm, Ruyton Xi Towns - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wykey Farm, Ruyton Xi Towns - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wykey Farm, Ruyton Xi Towns - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 March 2022.
- Where is Wykey Farm, Ruyton Xi Towns - Solar Array?
- 11 km south-east of Oswestry, Shropshire, United Kingdom (postcode SY4 1JA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).