← Back to Somerset

Solar · United Kingdom

Yardwall Manor

Operator Foresight

Operational3 MWData checked 16 November 2026Source record dated 2 May 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yardwall Manor is a 3 MW solar farm 6.3 km east of Burnham-on-Sea, Somerset, United Kingdom. Its planning application (33/14/00024) went to Somerset on 9 July 2014 and was granted on 29 September 2014. It has been operating since 8 June 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 27 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 470 energy sites within 40 km for Yardwall Manor

Members see the sites and incidents around this one, and every record behind them.

FORESIGHT LIMITED (01845521), active, since 1984. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight
Location
Land at Yardwall Manor Farm Mark Highbridge TA9 4QE, Somerset, TA9 4LH, United Kingdom
Planning authority
Somerset
Planning application
33/14/00024
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 33/14/00024, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 9 July 2014 Planning application submitted
  • 29 September 2014 Planning permission granted
  • 30 April 2015 Construction started
  • 8 June 2015 Operational

None found. The register holds no published incident that names Yardwall Manor. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Yardwall Manor had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yardwall Manor; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Yardwall Manor?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 May 2018.
Where is Yardwall Manor?
6.3 km east of Burnham-on-Sea, Somerset, United Kingdom (postcode TA9 4LH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).