← Back to Somerset

Solar · United Kingdom

Huntspill Level Solar Park

Operator Wessex Solar Energy

Operational5.5 MWData checked 16 November 2026Source record dated 25 January 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Huntspill Level Solar Park is a 5.5 MW solar farm 5.5 km south-east of Burnham-on-Sea, Somerset, United Kingdom. Its planning application (25/15/00014) went to Somerset on 19 June 2015 and was granted on 11 September 2015. It has been operating since 15 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 25 other sites and 413 energy sites within 40 km for Huntspill Level Solar Park

Members see the sites and incidents around this one, and every record behind them.

WESSEX SOLAR ENERGY LIMITED (12226450), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wessex Solar Energy
Location
Bangor (bounded by Belfast Road, Somerset, TA9 3NP, United Kingdom
Planning authority
Somerset
Planning application
25/15/00014
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/15/00014, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 19 June 2015 Planning application submitted
  • 11 September 2015 Planning permission granted
  • 15 January 2016 Construction started
  • 15 March 2016 Operational

None found. The register holds no published incident that names Huntspill Level Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Huntspill Level Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Huntspill Level Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Huntspill Level Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 January 2017.
Where is Huntspill Level Solar Park?
5.5 km south-east of Burnham-on-Sea, Somerset, United Kingdom (postcode TA9 3NP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).