← Back to Tyne and Wear

Energy sites / United Kingdom / Tyne and Wear

Battery storage · United Kingdom

Port of Tyne

Operational35 MWChecked 6 October 2026Last changed in the dataset 9 May 2019

Technology
Battery storage (Stand-alone Storage)
Capacity
35 MW
Status
Operational
Operator or applicant
Foresight
Location
Port of Tyne, Tyne Dock, South Shields, Tyne & Wear, Tyne and Wear, NE34 9PT, United Kingdom
Planning authority
South Tyneside
Planning application
ST/0867/16/FUL
First operating
2018

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 7 September 2016 Planning application submitted
  • 1 April 2018 Construction started
  • 1 July 2018 Operational

None found. The register holds no published incident that names Port of Tyne. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.