Battery storage · United Kingdom
Port Of Tyne, Tyne Dock - Battery Storage
Operator Port of Tyne Battery Storage Limited · Owner South Shields Energy Storage LTD
Application SubmittedData checked 16 November 2026Source record dated 11 August 2022
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Port Of Tyne, Tyne Dock - Battery Storage is a battery storage site on the edge of Jarrow, Tyne And Wear, United Kingdom. Its planning application (ST/0524/22/FUL) went to South Tyneside on 22 July 2022. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 102 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Port Of Tyne, Tyne Dock - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Port Of Tyne, Tyne Dock - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 200 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 200 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 208 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 364 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Port of Tyne Battery Storage Limited
- Owner
- South Shields Energy Storage LTD
- Location
- Port of Tyne Tyne Dock South Shields, Tyne And Wear, NE34 9PS, United Kingdom
- Planning authority
- South Tyneside
- Planning application
- ST/0524/22/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ST/0524/22/FUL, with what the planning evidence pack adds for this site.
Every application in South Tyneside · Alerts for applications and incidents near here
Timeline
- 22 July 2022 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Port Of Tyne, Tyne Dock - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Port Of Tyne, Tyne Dock - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Port Of Tyne, Tyne Dock - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Port Of Tyne, Tyne Dock - Battery Storage?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2022.
- Where is Port Of Tyne, Tyne Dock - Battery Storage?
- On the edge of Jarrow, Tyne And Wear, United Kingdom (postcode NE34 9PS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).