Solar · United Kingdom

Welbeck Colliery

Operator Foresight

Operational11.3 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Welbeck Colliery is a 11.3 MW solar farm in Warsop, Nottinghamshire, United Kingdom. Its planning application (2012/0557/NT) went to Mansfield on 21 November 2012 and was granted on 11 February 2013. It has been operating since 25 July 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 637 energy sites within 40 km for Welbeck Colliery

Members see the sites and incidents around this one, and every record behind them.

FORESIGHT LIMITED (01845521), active, since 1984. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
11.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight
Location
Elkesley Road, Meden Vale, Mansfield, Nottinghamshire, Nottinghamshire, NG20 9PS, United Kingdom
Planning authority
Mansfield
Planning application
2012/0557/NT
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2012/0557/NT, with what the planning evidence pack adds for this site.

Every application in Mansfield · Alerts for applications and incidents near here

  • 21 November 2012 Planning application submitted
  • 11 February 2013 Planning permission granted
  • 15 March 2014 Construction started
  • 25 July 2014 Operational

None found. The register holds no published incident that names Welbeck Colliery. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Welbeck Colliery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Welbeck Colliery; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Welbeck Colliery?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Welbeck Colliery?
In Warsop, Nottinghamshire, United Kingdom (postcode NG20 9PS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).