← Back to Humberside

Onshore wind · United Kingdom

Withernwick (withdrawn)

Operator Energiekontor UK · Owner Energiekontor AG

Application Withdrawn25 MWData checked 16 November 2026Source record dated 9 June 2010

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Withernwick (withdrawn) is a 25 MW wind farm 7.3 km south of Hornsea, Humberside, United Kingdom. Its planning application (07/02271/STPLFE) went to East Riding of Yorkshire on 5 April 2007 and was withdrawn on 17 October 2007. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 11 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 35 other sites and 287 energy sites within 40 km for Withernwick (withdrawn)

Members see the sites and incidents around this one, and every record behind them.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Energiekontor UK
Owner
Energiekontor AG
Location
Land South North And North EastHomer HouseAldbrough RoadWithernwickEast Riding Of Yorkshire, Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
07/02271/STPLFE
Turbines
11

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/02271/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 5 April 2007 Planning application submitted
  • 17 October 2007 Application withdrawn

None found. The register holds no published incident that names Withernwick (withdrawn). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Withernwick (withdrawn) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Withernwick (withdrawn); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Withernwick (withdrawn)?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2010.
Where is Withernwick (withdrawn)?
7.3 km south of Hornsea, Humberside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).