Onshore wind · United Kingdom

Withernwick

Operator Energiekontor UK · Owner Energiekontor AG

Operational18 MWData checked 16 November 2026Source record dated 3 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Withernwick is a 18 MW wind farm 7.2 km south of Hornsea, Humberside, United Kingdom. Its planning application (08/01964/STPLFE) went to East Riding of Yorkshire on 4 April 2008 and was granted on 2 September 2008. It has been operating since 19 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 35 other sites and 287 energy sites within 40 km for Withernwick

Members see the sites and incidents around this one, and every record behind them.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
18 MW (this record)
All phases
26.2 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Energiekontor UK
Owner
Energiekontor AG
Location
Land North And North EastHomer HouseAldbrough RoadWithernwickEast Riding Of Yorkshire, Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
08/01964/STPLFE
Appeal reference
08/00213/REFUSE
First operating
2013
Turbines
9

This record is 18 MW, one part of a site built in phases. With Withernwick extension (8.2 MW) the phases on the register add up to 26.2 MW. Withernwick extension

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 08/01964/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 4 April 2008 Planning application submitted
  • 2 September 2008 Planning permission granted
  • 1 April 2012 Construction started
  • 19 March 2013 Operational

None found. The register holds no published incident that names Withernwick. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Withernwick had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Withernwick; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Withernwick?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2013.
Where is Withernwick?
7.2 km south of Hornsea, Humberside, United Kingdom.