Solar · United Kingdom

Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage

Operator GAM Capital Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 26 November 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage is a 49.9 MW solar farm 3.7 km north-west of Hedon, Yorkshire, United Kingdom. Its planning application (23/00760/STPLFE) went to East Riding of Yorkshire on 29 March 2023 and was granted on 11 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 93 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells93 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool182 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire255 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
GAM Capital Limited
Location
South & W/O Froghall Farm, Wyton Road, Preston, Hull, Yorkshire, HU12 8TY, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
23/00760/STPLFE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00760/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 29 March 2023 Planning application submitted
  • 11 November 2024 Planning permission granted
  • 11 November 2029 Planning permission runs out

None found. The register holds no published incident that names Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 November 2024.
Where is Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage?
3.7 km north-west of Hedon, Yorkshire, United Kingdom (postcode HU12 8TY).