Onshore wind · United Kingdom

The Limes Wind Turbines

Operator Broadview Energy · Owner Broadview Ventures Limited

Operational1.7 MWData checked 16 November 2026Source record dated 3 July 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Limes Wind Turbines is a 1.7 MW wind farm on the edge of Hedon, Humberside, United Kingdom. Its planning application (11/01980/STPLFE) went to East Riding of Yorkshire on 9 May 2011 and was granted on 19 November 2012. It has been operating since 15 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 7 other sites and 331 energy sites within 40 km for The Limes Wind Turbines

Members see the sites and incidents around this one, and every record behind them.

BROADVIEW ENERGY LIMITED (04657768), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
1.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Broadview Energy
Owner
Broadview Ventures Limited
Location
to the west of Staithes Road at Salt End, Hull., Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
11/01980/STPLFE
First operating
2015
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/01980/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 9 May 2011 Planning application submitted
  • 19 November 2012 Planning permission granted
  • 12 May 2014 Construction started
  • 15 January 2015 Operational

None found. The register holds no published incident that names The Limes Wind Turbines. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has The Limes Wind Turbines had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Limes Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of The Limes Wind Turbines?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2018.
Where is The Limes Wind Turbines?
On the edge of Hedon, Humberside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).