Battery storage · United Kingdom

Clough Road - Battery Energy System

Operator GAM Capital Limited

Awaiting Construction130 MWData checked 16 November 2026Source record dated 20 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Clough Road - Battery Energy System is a 130 MW battery storage site on the edge of Kingston upon Hull, East Riding of Yorkshire, United Kingdom. Its planning application (23/02771/FULL) went to Kingston upon Hull, City of on 13 June 2023 and was granted on 12 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 82 other energy sites within 10 km, 25 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clough Road - Battery Energy System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells89 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool175 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire252 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
130 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
GAM Capital Limited
Location
S/O Clough Road, Kingston Upon Hull, East Riding of Yorkshire, HU5 1SW, United Kingdom
Planning authority
Kingston upon Hull, City of
Planning application
23/02771/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02771/FULL, with what the planning evidence pack adds for this site.

Every application in Kingston upon Hull, City of · Alerts for applications and incidents near here

  • 13 June 2023 Planning application submitted
  • 12 September 2023 Planning permission granted
  • 12 September 2026 Planning permission expired

None found. The register holds no published incident that names Clough Road - Battery Energy System. If you know of one, report it (confidential reports are anonymised).

Has Clough Road - Battery Energy System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clough Road - Battery Energy System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clough Road - Battery Energy System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 September 2023.
Where is Clough Road - Battery Energy System?
On the edge of Kingston upon Hull, East Riding of Yorkshire, United Kingdom (postcode HU5 1SW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).