Onshore wind · United Kingdom
Withern
Operator Lincolnshire Windpower Limited
Application Refused1.3 MWData checked 16 November 2026Source record dated 5 January 2010
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Withern is a 1.3 MW wind farm 5.6 km west of Mablethorpe, Lincolnshire, United Kingdom. Its planning application (N/212/02279/05) went to East Lindsey on 21 September 2005 and was refused on 12 June 2006. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 6 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Withern changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Lincolnshire Windpower Limited
- Location
- Stain LaneWithernLincs, Lincolnshire, United Kingdom
- Planning authority
- East Lindsey
- Planning application
- N/212/02279/05
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for N/212/02279/05, with what the planning evidence pack adds for this site.
Every application in East Lindsey · Alerts for applications and incidents near here
Timeline
- 21 September 2005 Planning application submitted
- 12 June 2006 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Withern. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Withern had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Withern; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Withern?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2010.
- Where is Withern?
- 5.6 km west of Mablethorpe, Lincolnshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).