Onshore wind · United Kingdom

Gayton Le Marsh Wind Farm

Operator Energiekontor UK · Owner Energiekontor AG

Operational16.4 MWData checked 16 November 2026Source record dated 4 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gayton Le Marsh Wind Farm is a 16.4 MW wind farm 6.8 km west of Mablethorpe, Lincolnshire, United Kingdom. Its planning application (N/063/01392/11) went to East Lindsey on 15 August 2011 and was granted on appeal on 5 April 2013. It has been operating since 26 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 35 other sites and 135 energy sites within 40 km for Gayton Le Marsh Wind Farm

Members see the sites and incidents around this one, and every record behind them.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
16.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Energiekontor UK
Owner
Energiekontor AG
Location
Carlton Grange, Thacker Bank, Great Carlton, Gayton Le Marsh, Louth, Lincolnshire (3.3km to the northeast of Great Carlton and 2.4km south of Saltfleetby), Lincolnshire, LN11 7TXL, United Kingdom
Planning authority
East Lindsey
Planning application
N/063/01392/11
Appeal reference
APP/D2510/A/12/2176754/NWF
First operating
2016
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for N/063/01392/11, with what the planning evidence pack adds for this site.

Every application in East Lindsey · Alerts for applications and incidents near here

  • 15 August 2011 Planning application submitted
  • 25 May 2012 Planning permission refused
  • 5 April 2013 Planning permission granted
  • 5 April 2013 Appeal granted
  • 17 February 2015 Construction started
  • 26 February 2016 Operational

None found. The register holds no published incident that names Gayton Le Marsh Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gayton Le Marsh Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gayton Le Marsh Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Gayton Le Marsh Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2016.
Where is Gayton Le Marsh Wind Farm?
6.8 km west of Mablethorpe, Lincolnshire, United Kingdom (postcode LN11 7TXL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).