Solar · United Kingdom

High Leas

Operator European Energy Photovoltaics

Operational6.5 MWData checked 16 November 2026Source record dated 17 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Leas is a 6.5 MW solar farm 5 km north-east of Burwell, Lincolnshire, United Kingdom. Its planning application (N/161/01563/14) went to East Lindsey on 10 September 2014 and was granted on 10 December 2014. It has been operating since 18 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 10 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 144 energy sites within 40 km for High Leas

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
European Energy Photovoltaics
Location
Land north of High Leas Farm, Willoughby Lane, South Reston, Louth, Lincolnshire, Lincolnshire, LN11 8PJ, United Kingdom
Planning authority
East Lindsey
Planning application
N/161/01563/14
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for N/161/01563/14, with what the planning evidence pack adds for this site.

Every application in East Lindsey · Alerts for applications and incidents near here

  • 10 September 2014 Planning application submitted
  • 10 December 2014 Planning permission granted
  • 15 October 2015 Construction started
  • 18 December 2015 Operational

None found. The register holds no published incident that names High Leas. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has High Leas had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Leas; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Leas?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 February 2016.
Where is High Leas?
5 km north-east of Burwell, Lincolnshire, United Kingdom (postcode LN11 8PJ).