← Back to Lincolnshire

Onshore wind · United Kingdom

Asserby wind farm

Operator Energiekontor UK · Owner Energiekontor AG

Application Refused10 MWData checked 16 November 2026Source record dated 29 June 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Asserby wind farm is a 10 MW wind farm 8.3 km south of Mablethorpe, Lincolnshire, United Kingdom. Its planning application (N/016/01046/14) went to East Lindsey on 26 June 2014 and was refused on 18 June 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 11 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 35 other sites and 98 energy sites within 40 km for Asserby wind farm

Members see the sites and incidents around this one, and every record behind them.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Energiekontor UK
Owner
Energiekontor AG
Location
LAND SOUTH OF WILLOW FARM, ASSERBY ROAD, ASSERBY, Lincolnshire, United Kingdom
Planning authority
East Lindsey
Planning application
N/016/01046/14
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for N/016/01046/14, with what the planning evidence pack adds for this site.

Every application in East Lindsey · Alerts for applications and incidents near here

  • 26 June 2014 Planning application submitted
  • 18 June 2015 Planning permission refused

None found. The register holds no published incident that names Asserby wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Asserby wind farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Asserby wind farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Asserby wind farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2015.
Where is Asserby wind farm?
8.3 km south of Mablethorpe, Lincolnshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).