Onshore wind · United Kingdom

Winwick

Operator Blue Energy

Operational12.3 MWData checked 16 November 2026Source record dated 16 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Winwick is a 12.3 MW wind farm 12 km west of Brixworth, Northamptonshire, United Kingdom. Its planning application (DA/2010/0400) went to West Northamptonshire on 17 May 2010 and was granted on appeal on 13 July 2012. It has been operating since 30 June 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 27 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 6 other sites and 582 energy sites within 40 km for Winwick

Members see the sites and incidents around this one, and every record behind them.

BLUE ENERGY LIMITED (06456350), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
12.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Blue Energy
Location
Land To North and West Of Winwick Warren, Cold Ashby Road, Winwick, Northampton, Northamptonshire, NN6, Northamptonshire, United Kingdom
Planning authority
West Northamptonshire
Planning application
DA/2010/0400
Appeal reference
APP/Y2810/A/11/2156527
First operating
2016
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DA/2010/0400, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 17 May 2010 Planning application submitted
  • 13 July 2012 Planning permission granted
  • 13 July 2012 Planning permission refused
  • 13 July 2012 Appeal granted
  • 15 April 2015 Construction started
  • 30 June 2016 Operational

None found. The register holds no published incident that names Winwick. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Winwick had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Winwick; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Winwick?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2016.
Where is Winwick?
12 km west of Brixworth, Northamptonshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).