Onshore wind · United Kingdom
Chiplow
Operator Blue Energy
Operational8.2 MWData checked 16 November 2026Source record dated 16 August 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Chiplow is a 8.2 MW wind farm 11 km west of Fakenham, Norfolk, United Kingdom. Its planning application (10/00883/FM) went to King's Lynn and West Norfolk on 26 May 2010 and was granted on appeal on 24 May 2012. It has been operating since 30 April 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 10 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Chiplow changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
BLUE ENERGY LIMITED (06456350), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 8.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Blue Energy
- Location
- Bewteen the villages of Bagthorpe, Barmer and Syderstone in North West Norfolk, Norfolk, United Kingdom
- Planning authority
- King's Lynn and West Norfolk
- Planning application
- 10/00883/FM
- Appeal reference
- 11/00026/REF
- First operating
- 2016
- Turbines
- 5
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00883/FM, with what the planning evidence pack adds for this site.
Every application in King's Lynn and West Norfolk · Alerts for applications and incidents near here
Timeline
- 26 May 2010 Planning application submitted
- 10 May 2011 Planning permission refused
- 24 May 2012 Planning permission granted
- 24 May 2012 Appeal granted
- 31 March 2015 Construction started
- 30 April 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Chiplow. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Chiplow had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Chiplow; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Chiplow?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2016.
- Where is Chiplow?
- 11 km west of Fakenham, Norfolk, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).