← Back to Devon

Solar · United Kingdom

Willsland Solar farm

Operator The Green Company

Operational3.2 MWData checked 16 November 2026Source record dated 12 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Willsland Solar farm is a 3.2 MW solar farm 13 km north-west of Okehampton, Devon, United Kingdom. Its planning application (01537/2011) went to West Devon on 18 May 2011 and was granted on appeal on 7 March 2012. It has been operating since 21 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 179 energy sites within 40 km for Willsland Solar farm

Members see the sites and incidents around this one, and every record behind them.

THE GREEN COMPANY (UK) LIMITED (06147579), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
The Green Company
Location
Highampton, Beaworthy, Devon, Devon, United Kingdom
Planning authority
West Devon
Planning application
01537/2011
Appeal reference
No appeal number
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 01537/2011, with what the planning evidence pack adds for this site.

Every application in West Devon · Alerts for applications and incidents near here

  • 18 May 2011 Planning application submitted
  • 13 September 2011 Planning permission refused
  • 7 March 2012 Planning permission granted
  • 7 March 2012 Appeal granted
  • 10 January 2013 Construction started
  • 21 March 2013 Operational

None found. The register holds no published incident that names Willsland Solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Willsland Solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Willsland Solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Willsland Solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2013.
Where is Willsland Solar farm?
13 km north-west of Okehampton, Devon, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).