Trevemper solar farm

Operator The Green Company

Operational1.7 MWData checked 16 November 2026Source record dated 30 April 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trevemper solar farm is a 1.7 MW solar farm on the edge of Newquay, Cornwall, United Kingdom. Its planning application (PA11/00374) went to Cornwall on 20 January 2011 and was granted on 2 May 2011. It has been operating since 20 September 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 187 energy sites within 40 km for Trevemper solar farm

Members see the sites and incidents around this one, and every record behind them.

THE GREEN COMPANY (UK) LIMITED (06147579), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
The Green Company
Location
Land At Trevemper Crantock Cornwall, Cornwall, United Kingdom
Planning authority
Cornwall
Planning application
PA11/00374
First operating
2011

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA11/00374, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 20 January 2011 Planning application submitted
  • 2 May 2011 Planning permission granted
  • 20 September 2011 Operational

None found. The register holds no published incident that names Trevemper solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Trevemper solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trevemper solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trevemper solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 April 2012.
Where is Trevemper solar farm?
On the edge of Newquay, Cornwall, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).