Solar · United Kingdom
HENDRA HOLIDAY PARK SOLAR FARM
Operator Hendra Holiday Park
Operational1.2 MWData checked 16 November 2026Source record dated 8 October 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
HENDRA HOLIDAY PARK SOLAR FARM is a 1.2 MW solar farm on the edge of Newquay, Cornwall, United Kingdom. Its planning application (PA11/03163) went to Cornwall on 14 April 2011 and was granted on 14 July 2011. It has been operating since 7 August 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when HENDRA HOLIDAY PARK SOLAR FARM changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Hendra Holiday Park
- Location
- Trevilley Farm, Lane, Newquay, Cornwall, Cornwall, TR8 4PX, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA11/03163
- First operating
- 2011
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA11/03163, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 14 April 2011 Planning application submitted
- 14 July 2011 Planning permission granted
- 7 August 2011 Operational
Incidents on the register at this site
None found. The register holds no published incident that names HENDRA HOLIDAY PARK SOLAR FARM. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has HENDRA HOLIDAY PARK SOLAR FARM had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names HENDRA HOLIDAY PARK SOLAR FARM; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of HENDRA HOLIDAY PARK SOLAR FARM?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2013.
- Where is HENDRA HOLIDAY PARK SOLAR FARM?
- On the edge of Newquay, Cornwall, United Kingdom (postcode TR8 4PX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).