Solar · United Kingdom

Tregonning Farm - Solar Farm & Battery Storage

Operator European Energy

Under Construction68 MWData checked 16 November 2026Source record dated 30 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tregonning Farm - Solar Farm & Battery Storage is a 68 MW solar farm 5.7 km south-east of Newquay, Cornwall, United Kingdom. Its planning application (PA22/01511) went to Cornwall on 4 March 2022 and was granted on 5 December 2023. Construction started on 1 May 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 50 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tregonning Farm - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 115 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter115 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire261 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool363 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
68 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
European Energy
Location
East Of Tregonning Farm Kestle Mill, Cornwall, TR8 4PR, United Kingdom
Planning authority
Cornwall
Planning application
PA22/01511

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA22/01511, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 4 March 2022 Planning application submitted
  • 5 December 2023 Planning permission granted
  • 1 May 2026 Construction started

None found. The register holds no published incident that names Tregonning Farm - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Tregonning Farm - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tregonning Farm - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tregonning Farm - Solar Farm & Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2026.
Where is Tregonning Farm - Solar Farm & Battery Storage?
5.7 km south-east of Newquay, Cornwall, United Kingdom (postcode TR8 4PR).