Solar · United Kingdom
Summercourt Solar Farm (Glebe Farm)
Operator Solar Securities Group Ltd
Operational1.1 MWData checked 16 November 2026Source record dated 14 June 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Summercourt Solar Farm (Glebe Farm) is a 1.1 MW solar farm 9.4 km south-east of Newquay, Cornwall, United Kingdom. Its planning application (PA12/05890) went to Cornwall on 26 June 2012 and was granted on 31 October 2012. It has been operating since 30 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 52 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Summercourt Solar Farm (Glebe Farm) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Solar Securities Group Ltd
- Location
- Glebe Farm, Narrow Lane, Penhale, Summercourt, Cornwall, TR8 5ED, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA12/05890
- First operating
- 2013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA12/05890, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 26 June 2012 Planning application submitted
- 31 October 2012 Planning permission granted
- 1 February 2013 Construction started
- 30 March 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Summercourt Solar Farm (Glebe Farm). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Summercourt Solar Farm (Glebe Farm) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Summercourt Solar Farm (Glebe Farm); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Summercourt Solar Farm (Glebe Farm)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2013.
- Where is Summercourt Solar Farm (Glebe Farm)?
- 9.4 km south-east of Newquay, Cornwall, United Kingdom (postcode TR8 5ED).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).