Solar · United Kingdom
Burthy Farm
Operator Elgin Energy EsCo
Operational10 MWData checked 16 November 2026Source record dated 28 May 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Burthy Farm is a 10 MW solar farm 11 km south-east of Newquay, Cornwall, United Kingdom. Its planning application (PA13/05983) went to Cornwall on 12 July 2013 and was granted on appeal on 30 September 2014. It has been operating since 20 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 54 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Burthy Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Elgin Energy EsCo
- Location
- Summercourt Newquay Cornwall, Cornwall, TR8 5BN, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA13/05983
- Appeal reference
- APP/D0840/W/14/2212340
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA13/05983, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 12 July 2013 Planning application submitted
- 30 October 2013 Planning permission refused
- 27 January 2014 Appeal lodged
- 30 September 2014 Planning permission granted
- 30 September 2014 Appeal granted
- 1 December 2014 Construction started
- 20 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Burthy Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Burthy Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Burthy Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Burthy Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2015.
- Where is Burthy Farm?
- 11 km south-east of Newquay, Cornwall, United Kingdom (postcode TR8 5BN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).