Full planning pack, launch price £145Other options

Planning application · Solar · West Devon

Willsland Solar farm

Operational3.2 MWApplication 01537/2011Submitted 18 May 2011Granted on appeal 7 March 2012

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
01537/2011
Planning authority
West Devon
County or area
Devon
Nation
England
Technology
Solar
Capacity
3.2 MW
Status
Operational
Operator or applicant
The Green Company
Location
Highampton, Beaworthy, Devon
Appeal reference
No appeal number
First operating
2013
  • 18 May 2011 Planning application submitted
  • 13 September 2011 Planning permission refused
  • 7 March 2012 Planning permission granted
  • 7 March 2012 Appeal granted
  • 10 January 2013 Construction started
  • 21 March 2013 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop26 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control49 kmSignificant
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage52 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Willsland Solar farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in West Devon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.