Onshore wind · United Kingdom
West of Hallhole Farm, Meikleour - Wind Turbine
Operator The Meikleour Trust
Awaiting Construction1 MWData checked 16 November 2026Source record dated 13 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
West of Hallhole Farm, Meikleour - Wind Turbine is a 1 MW wind farm 5 km south of Blairgowrie and Rattray, Perth and Kinross, United Kingdom. Its planning application (24/00877/FLL) went to Perth and Kinross on 14 June 2024 and was granted on 24 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when West of Hallhole Farm, Meikleour - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for West of Hallhole Farm, Meikleour - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0441 | 2025 | Wind turbine collapses at Aviva's Pitheavlis site in Perth | 18 km | Significant |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 54 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 54 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- The Meikleour Trust
- Location
- 530 Metres S/O Muir Ale House, Meikleour, Perth, Perth and Kinross, PH2 6EW, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 24/00877/FLL
- Turbines
- 1, 76.5 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/00877/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 14 June 2024 Planning application submitted
- 24 December 2025 Planning permission granted
- 23 December 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names West of Hallhole Farm, Meikleour - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has West of Hallhole Farm, Meikleour - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names West of Hallhole Farm, Meikleour - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of West of Hallhole Farm, Meikleour - Wind Turbine?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
- Where is West of Hallhole Farm, Meikleour - Wind Turbine?
- 5 km south of Blairgowrie and Rattray, Perth and Kinross, United Kingdom (postcode PH2 6EW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).