Onshore wind · United Kingdom

West of Hallhole Farm, Meikleour - Wind Turbine

Operator The Meikleour Trust

Awaiting Construction1 MWData checked 16 November 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

West of Hallhole Farm, Meikleour - Wind Turbine is a 1 MW wind farm 5 km south of Blairgowrie and Rattray, Perth and Kinross, United Kingdom. Its planning application (24/00877/FLL) went to Perth and Kinross on 14 June 2024 and was granted on 24 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for West of Hallhole Farm, Meikleour - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth18 kmSignificant
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm54 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK54 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
The Meikleour Trust
Location
530 Metres S/O Muir Ale House, Meikleour, Perth, Perth and Kinross, PH2 6EW, United Kingdom
Planning authority
Perth and Kinross
Planning application
24/00877/FLL
Turbines
1, 76.5 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00877/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 14 June 2024 Planning application submitted
  • 24 December 2025 Planning permission granted
  • 23 December 2028 Planning permission runs out

None found. The register holds no published incident that names West of Hallhole Farm, Meikleour - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has West of Hallhole Farm, Meikleour - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names West of Hallhole Farm, Meikleour - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of West of Hallhole Farm, Meikleour - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
Where is West of Hallhole Farm, Meikleour - Wind Turbine?
5 km south of Blairgowrie and Rattray, Perth and Kinross, United Kingdom (postcode PH2 6EW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).