Battery storage · United Kingdom
Coupar Angus, Pleasance Road - Battery Energy Facility
Operator Gresham House Asset Management Limited
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 24 September 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Coupar Angus, Pleasance Road - Battery Energy Facility is a 49.9 MW battery storage site 6.9 km south-east of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (24/00200/FLM) went to Perth and Kinross on 13 March 2024 and was granted on 11 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Coupar Angus, Pleasance Road - Battery Energy Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Coupar Angus, Pleasance Road - Battery Energy Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 351 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 351 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 405 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 544 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Gresham House Asset Management Limited
- Location
- 130 Metres South East Of Coupar Angus Substation Pleasance Road, Tayside, PH13 9LZ, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 24/00200/FLM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/00200/FLM, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 11 September 2023 Planning permission expired
- 13 March 2024 Planning application submitted
- 11 September 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Coupar Angus, Pleasance Road - Battery Energy Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Coupar Angus, Pleasance Road - Battery Energy Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Coupar Angus, Pleasance Road - Battery Energy Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Coupar Angus, Pleasance Road - Battery Energy Facility?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 September 2024.
- Where is Coupar Angus, Pleasance Road - Battery Energy Facility?
- 6.9 km south-east of Blairgowrie and Rattray, Tayside, United Kingdom (postcode PH13 9LZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).