← Back to Tayside

Battery storage · United Kingdom

Pleasance Road - Battery Energy Facility

Operator Gresham House

Operational49.9 MWData checked 16 November 2026Source record dated 27 March 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Pleasance Road - Battery Energy Facility is a 49.9 MW battery storage site 7.3 km south-east of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (22/00195/FLM) went to Perth and Kinross on 25 February 2022 and was granted on 1 June 2022. It has been operating since 1 June 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 11 other sites and 227 energy sites within 40 km for Pleasance Road - Battery Energy Facility

Members see the sites and incidents around this one, and every record behind them.

GRESHAM HOUSE LIMITED (00000871), active, since 1857. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Gresham House
Location
130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar, Tayside, PH13 9LZ, United Kingdom
Planning authority
Perth and Kinross
Planning application
22/00195/FLM
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00195/FLM, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 25 February 2022 Planning application submitted
  • 1 June 2022 Planning permission granted
  • 1 June 2023 Operational

None found. The register holds no published incident that names Pleasance Road - Battery Energy Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pleasance Road - Battery Energy Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pleasance Road - Battery Energy Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pleasance Road - Battery Energy Facility?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2024.
Where is Pleasance Road - Battery Energy Facility?
7.3 km south-east of Blairgowrie and Rattray, Tayside, United Kingdom (postcode PH13 9LZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).