Pleasance Road is a 45 MW battery storage site 7.3 km south-east of Blairgowrie and Rattray, Perth and Kinross, United Kingdom. Its planning application (19/00513/FLM) went to Perth and Kinross on 29 March 2019. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 22 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

7 Oct7 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 1,481 MWh out and 1,713 MWh in, active 51% of half hours, peak 20 MW of 45. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

CORONATION POWER LIMITED (04971270), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pleasance Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 350 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool350 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells404 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire543 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
45 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Coronation Power
Owner
Om Shiva Management Holdings Limited
Location
Land 130M S/E of, Pleasance Road, Coupar Angus Substation, Blairgowrie, Tayside, Perth and Kinross, PH13 9JB, United Kingdom
Planning authority
Perth and Kinross
Planning application
19/00513/FLM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/00513/FLM, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 29 March 2019 Planning application submitted
  • 23 September 2022 Planning permission expired

None found. The register holds no published incident that names Pleasance Road. If you know of one, report it (confidential reports are anonymised).

Has Pleasance Road had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pleasance Road; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pleasance Road?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 8 March 2022.