Solar · United Kingdom
Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm
Operator EcoDev Group Limited · Owner Restore Energy Limited
Awaiting Construction20.5 MWData checked 16 November 2026Source record dated 19 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm is a 20.5 MW solar farm 7.1 km south of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (ECU00004521) went to Scottish Government (S36) on 22 July 2022 and was granted on 13 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ECODEV GROUP LTD (10276309), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 350 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 350 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 404 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 543 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 20.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- EcoDev Group Limited
- Owner
- Restore Energy Limited
- Location
- Mains Of Keithick Farm, Keithick, Blairgowrie, Tayside, PH13 9NF, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004521
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00004521, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 22 July 2022 Planning application submitted
- 13 March 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
- Where is Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm?
- 7.1 km south of Blairgowrie and Rattray, Tayside, United Kingdom (postcode PH13 9NF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).