Upper Holton Wind Farm

Operator Temporis Capital · Owner Candelia Limited

Operational11.5 MWData checked 16 November 2026Source record dated 4 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Upper Holton Wind Farm is a 11.5 MW wind farm on the edge of Halesworth, Suffolk, United Kingdom. Its planning application (DC/13/0014/DRC) went to East Suffolk on 7 January 2013 and was granted on 12 February 2013. It has been operating since 26 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 6 other sites and 201 energy sites within 40 km for Upper Holton Wind Farm

Members see the sites and incidents around this one, and every record behind them.

TEMPORIS CAPITAL LIMITED (09000848), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
11.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Temporis Capital
Owner
Candelia Limited
Location
Wind Farm, Upper Holton, Holton, Suffolk, Suffolk, United Kingdom
Planning authority
East Suffolk
Planning application
DC/13/0014/DRC
First operating
2016
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/13/0014/DRC, with what the planning evidence pack adds for this site.

Every application in East Suffolk · Alerts for applications and incidents near here

  • 7 January 2013 Planning application submitted
  • 12 February 2013 Planning permission granted
  • 1 June 2014 Construction started
  • 26 February 2016 Operational

None found. The register holds no published incident that names Upper Holton Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Upper Holton Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Holton Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Upper Holton Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2016.
Where is Upper Holton Wind Farm?
On the edge of Halesworth, Suffolk, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).