← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · East Suffolk

Upper Holton Wind Farm

Operational11.5 MWApplication DC/13/0014/DRCSubmitted 7 January 2013Granted 12 February 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/13/0014/DRC
Planning authority
East Suffolk
County or area
Suffolk
Nation
England
Technology
Onshore wind
Capacity
11.5 MW
Status
Operational
Operator or applicant
Temporis Capital
Location
Wind Farm, Upper Holton, Holton, Suffolk
Turbines
5
First operating
2016
  • 7 January 2013 Planning application submitted
  • 12 February 2013 Planning permission granted
  • 1 June 2014 Construction started
  • 26 February 2016 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0895, Wind turbine catches fire at Doddington wind farm after storms, 101 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms101 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm107 kmSignificant
EIR-15782024Wind turbine fire near Chumleigh in Devon109 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Upper Holton Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Suffolk.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.