Ty’n y Waun - Solar Farm (Bridgend Energy Hub) is a 40 MW solar farm on the edge of Pencoed, Mid Glamorgan, United Kingdom. Its planning application (DNS/3279521) went to Welsh Government (NSIP) on 29 June 2023 and was granted on 11 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ty’n y Waun - Solar Farm (Bridgend Energy Hub) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
CENIN RENEWABLES LIMITED (07598482), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ty’n y Waun - Solar Farm (Bridgend Energy Hub) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 51 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 51 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 66 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 66 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 40 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Cenin Renewables Limited
- Owner
- Cenin Holdings LTD
- Location
- Btw Heol Laethog and Heol Y Cyw, Bridgend, Mid Glamorgan, CF35 6HL, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3279521
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DNS/3279521, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 29 June 2023 Planning application submitted
- 11 October 2024 Planning permission granted
- 11 October 2034 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Ty’n y Waun - Solar Farm (Bridgend Energy Hub). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ty’n y Waun - Solar Farm (Bridgend Energy Hub) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ty’n y Waun - Solar Farm (Bridgend Energy Hub); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ty’n y Waun - Solar Farm (Bridgend Energy Hub)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2024.
- Where is Ty’n y Waun - Solar Farm (Bridgend Energy Hub)?
- On the edge of Pencoed, Mid Glamorgan, United Kingdom (postcode CF35 6HL).