Planning pack for this site, £295Other options

Solar · United Kingdom

Mynydd Maen Solar Farm (Cil-Lonydd)

Operator Cenin Renewables Limited · Owner Cenin Holdings LTD

Awaiting Construction35 MWData checked 16 November 2026Source record dated 6 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Maen Solar Farm (Cil-Lonydd) is a 35 MW solar farm Mid Glamorgan, United Kingdom. Its planning application (DNS CAS-02446-R8X8W2) went to Welsh Government (NSIP) on 19 July 2024 and was granted on 12 November 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

CENIN RENEWABLES LIMITED (07598482), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mynydd Maen Solar Farm (Cil-Lonydd) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-29232026Small inverter fire at solar installation near Market Draytonnot mappedMinor
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalownot mappedMajor
EIR-14862026Fire under solar panels at Broadclyst brought under controlnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cenin Renewables Limited
Owner
Cenin Holdings LTD
Location
Cil-Onnydd Farm, Newbridge, Caerphilly, Mid Glamorgan, NP11, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS CAS-02446-R8X8W2

The planning application page for DNS CAS-02446-R8X8W2, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) ·

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 19 July 2024 Planning application submitted
  • 12 November 2025 Planning permission granted
  • 12 November 2030 Planning permission runs out

None found. The register holds no published incident that names Mynydd Maen Solar Farm (Cil-Lonydd). If you know of one, report it (confidential reports are anonymised).

Has Mynydd Maen Solar Farm (Cil-Lonydd) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Maen Solar Farm (Cil-Lonydd); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mynydd Maen Solar Farm (Cil-Lonydd)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Mynydd Maen Solar Farm (Cil-Lonydd)?
Mid Glamorgan, United Kingdom (postcode NP11).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.