Planning pack for this site, £295Other options

Battery storage · United Kingdom

Mynydd Maen Solar Farm (Cil-Lonydd)

Operator Cenin Renewables Limited · Owner Cenin Holdings LTD

Awaiting Construction35 MWData checked 16 November 2026Source record dated 9 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mynydd Maen Solar Farm (Cil-Lonydd) is a 35 MW battery storage site Mid Glamorgan, United Kingdom. Its planning application (DNS CAS-02446-R8X8W2) went to Welsh Government (NSIP) on 19 July 2024 and was granted on 12 November 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CENIN RENEWABLES LIMITED (07598482), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mynydd Maen Solar Farm (Cil-Lonydd) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeternot mappedSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cellsnot mappedSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershirenot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cenin Renewables Limited
Owner
Cenin Holdings LTD
Location
Cil-Onnydd Farm, Newbridge, Caerphilly, Mid Glamorgan, NP11, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS CAS-02446-R8X8W2

The planning application page for DNS CAS-02446-R8X8W2, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) ·

  • 19 July 2024 Planning application submitted
  • 12 November 2025 Planning permission granted
  • 12 November 2030 Planning permission runs out

None found. The register holds no published incident that names Mynydd Maen Solar Farm (Cil-Lonydd). If you know of one, report it (confidential reports are anonymised).

Has Mynydd Maen Solar Farm (Cil-Lonydd) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Maen Solar Farm (Cil-Lonydd); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mynydd Maen Solar Farm (Cil-Lonydd)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 December 2025.
Where is Mynydd Maen Solar Farm (Cil-Lonydd)?
Mid Glamorgan, United Kingdom (postcode NP11).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.