Mynydd Maen Solar Farm (Cil-Lonydd)

Awaiting Construction35 MWApplication DNS CAS-02446-R8X8W2Submitted 19 July 2024Granted 12 November 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DNS CAS-02446-R8X8W2
Planning authority
Welsh Government (NSIP)
County or area
Mid Glamorgan
Nation
Wales
Technology
Battery storage (Stand-alone Storage)
Capacity
35 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cenin Renewables Limited
Location
Cil-Onnydd Farm, Newbridge, Caerphilly, NP11
  • 19 July 2024 Planning application submitted
  • 12 November 2025 Planning permission granted
  • 12 November 2030 Planning permission expired Date as recorded in the register

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeternot mappedSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cellsnot mappedSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershirenot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NP11 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Welsh Government (NSIP).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.